If you are new to the industry and are looking to build out your dream concept, we are here to help guide you through the process. We love being an integral part of the team. Partnering with clients, consultants (architects + engineers), and your general contractor ensures your project will be set up for success.
SEE
DETAILS
TIMEFRAME:
6 MONTHS - 2 YEARS
The project timeframe depends heavily on the complexity, size, scope, base building schedule, municipality review, contractor timeline, and owner approvals.
We have provided a detailed outline of what can be expected in each phase of your build-out. Some items listed below are the responsibility of the Owner, architect, general contractor, or other consultant.
Formal proposal within one week of consultation
deliverables
OWNER + DESIGNER
TIMELINE: 1 DAY
Overall project Mood Board
Early Branding Concepts
deliverables
OWNER + DESIGNER
TIMELINE: 2-4 WEEKS
Preliminary floor plan(s)
Preliminary kitchen layout
Architectural review for code compliance
Landlord review for lease compliance
deliverables
OWNER.DESIGNER.ARCHITECT. LANDLORD + KITCHEN CONSULTANT
TIMELINE: 2-4 WEEKS
TIMELINE: 4-8 WEEKS
Full design presentation to include:
Images of proposed furnishings selections
Physical samples of proposed finish selections
Images of proposed lighting selections
Images of proposed plumbing selections
Images of proposed graphics, art, and accessory selections
Conceptual Images of proposed built-in pieces (millwork)
Colored 2D Elevations of select spaces
3D Photorealistic renderings of key spaces
Final Floor Plan showing actual sizes and selected pieces
deliverables
DESIGN TEAM
TIMELINE:4-12 WEEKS
ID (Interior Design) set of construction documents to be included in the overall working drawings.
Detailed Specification Package for all Furnishings, Decorative Lighting, Art + Accessories
Detailed Budget for all Furnishings, Decorative Lighting, Art + Accessories
deliverables
DESIGNER. ARCHITECT.
CONSULTANT + ENGINEERS
TIMELINE: 6-12 WEEKS
Building Permit(s)
GC Bid(s)
VE review and adjust specifications to align with the project budget
deliverables
OWNEr. ARCHITECT + GC
TIMELINE:12 WEEKS - 1 YEAR
Shop drawing review +approvals
Finish sample review + approvals
Construction coordination + management
deliverables
OWNER. GENERAL CONTRACTOR. DESIGNER + ARCHITECT
TIMELINE:8-20 WEEKS
Final furnishings budget with lead times.
Procurement management.
Coordination with 3rd party warehouse if requested by Owner.
Final FF+E Installation